Ongoing Projects
Atatürk Educational Campus – Primary School Project in Dudullu OIZ
EMPLOYER: ISTANBUL DUDULLU ORGANİZED INDUSTRİAL ZONE DATE: 2025 LOCATION: ISTANBUL AREA: 11,200 M⊃2; SCOPE: MECHANİCAL INSTALLATİON WORKS
Ankara Justice Palace A&TA&O Blocks
EMPLOYER: REC ULUSLARARASI İNŞAAT YATIRIM SANAYİ VE TİCARET AŞ DATE: 2025 LOCATİON: ANKARA AREA: 250.000 m2 SCOPE: ELEKTROMEKANİK
Istanbul International Finance Center Stock Exchange Building
EMPLOYER: CEVAHİR YAPI SANAYİ TURİZM VE TİCARET AŞ DATE: 2025 LOCATİON: İSTANBUL AREA: 80.000 m2 SCOPE: ELECTROMECHANICAL INSTALLATION
Turkuvaz Media Center
EMPLOYER: ESLA MÜHENDİSLİK ELEKTRİK ELEKTRONİK İNŞ. TAAH. TİC. A.Ş. DATE: 2024 LOCATION: ANKARA AREA: 10.500 m2 SCOPE: MECHANICAL
Yenisehir-Osmaneli High Standardized Railway Line Stations between Bandirma-Bursa
EMPLOYER: ISKA SVERIGE AB CENTRAL SWEDEN ISTANBUL CENTRAL BRANCH DATE: 2024 LOCATION: BURSA AREA: 4,050 m2
Eyüp Sultan Gokturk 2nd Stage Housing Project
Employer: Cevahir Yapı San. Turizm Tic. A.Ş. Date: 2023 Location: İstanbul Area: 65.000 m2 Scope: Electromechanical Contracting Works
Fikirtepe Urban Transformation Project 3466/1 Parcel
Employer: Kuzu Toplu Konut İnşaat A.Ş. Date: 2023 Location: İstanbul
Halk Yapı Dilovası Industrial Center
Employer: Kuzu Toplu Konut İnşaat A.Ş. Date: 2023 Location: İstanbul
Completed Projects
Akzirve Topkapi 29 Project
Employer: Dost İnşaat Tahhüt San.Tic.A.Ş.Date: 2022 Location: İstanbul Area:
Akzirve Topkapi 29 Project
Topkapı 29, for which we have undertaken the Electromechanical Contracting Works, comes to life in Topkapı,
Eren Holding Headquarters Building Metropol Istanbul
Eren Enerji Elektrik
Zorlu Levent 199 - Istanbul
It was built on Büyükdere Street with a construction area of 116,130 m3 in harmony with
Akbatı Residence
40.000 m2 Heating, Cooling, Air Conditioning, Plumbing,
Story 2 Residence
Heating system have been ensured with central heating system by the use of pre-paid calorimeters; cooling